Articles by topic » CLT

SCM Group expands portfolio for CLT processing

16.04.2021 − SCM Group has added the “Area XL” CNC machining centre to its existing product portfolio of plants for processing cross-laminated timber (CLT) elements. » more

ADVERTISEMENT

Ziegler Group to build insulating board works in Bärnau

09.04.2021 − After the plans for building a 200,000-t pellet plant along with a prefabricated-house works and CLT works in Tirschenreuth, Ziegler Group is also planning to build an insulating-board factory in Bärnau.» more

Södra CLT works’ start-up not likely until mid-2022

09.04.2021 − The start-up of the second cross-laminated timber (CLT) plant of Södra at its Värö facility, originally planned for the end of 2021, will probably not take place until the middle of 2022.» more

Echtle, Kübler, and Streit building joint CLT works

12.03.2021 − The three sawmilling and value-added timber companies Echtle, Kübler and Karl Streit are building a cross-laminated timber (CLT) works by autumn 2022 through their new joint venture HolzBauWerk Schwarzwald.» more