As part of the German prefabricated-construction day on 8 June, 2002, Schwörer Haus KG inaugurated their second biomass heat power plant. The plant was built with an investment volume of approximately €11m and has an output capacity of approximately 5.25 MW el. Together with the first biomass heat power plant ...
Schwörer starts up second heat power plant
You can only use this article with a valid subscription and registration. Registered subscribers can access all articles after entering their user name and password.
- Ad -