In the third quarter of 2019 US flooring and timber wholesaler Lumber Liquidators Inc. (Toano, Virginia) was confronted by a 2.4% turnover decline to US$263.9m (July-Sept. 2018: 270.5m). Excluding the four stores newly opened in the reporting period, turnover actually declined by 3.6%. In addition to the the ...
Network breakdown leads to losses at Lumber Liquidators
You can only use this article with a valid subscription and registration. Registered subscribers can access all articles after entering their user name and password.
- Ad -