Angara Plus commences production of Mabashira

The machine geared to an annual production capacity of 60,000 m³ of mabashira in two shifts at the Bratsk facility of the Siberian industrial timber company OOO Angara Plus commenced operation in September 2018. The project was realised by Weinig Concept GmbH & Co. KG, responsible for plant design and sales within ...

Read more

You can only use this article with a valid subscription and registration. Registered subscribers can access all articles after entering their user name and password.
- Ad -
- Ad -