|  
Wood-based panels» More news on Wood-based panels

Methanex launches production at Chile IV works

07.12.2018 − 

Towards the end of the second quarter, Methanex resumed at the Chile IV works that had been built with an annual capacity of 840,000 t in Cabo Negro near Punta Arenas in 2005. As such, the two works remaining in Chile are producing again after they had had to be shut down indefinitely in May 2014 due to gas-supply problems. Works I, which had been opened in 1988 with an annual capacity of around 800,000 t, had resumed operation in September 2014. According to Methanex, the combined annual capacity of both production plants meanwhile amounts to 1.720m t.

Tags of this news:

previous − Kronospan Luxembourg has new manufacturing concept

Further decline in foreign trade in raw particleboard  − next