Södra produces first CLT panel at plant II in Värö

In early June 2022, Södra AB (Växjö, Sweden) produced the first cross-laminated timber (CLT) panel at the second CLT plant built at its Värö site. According to the supplier of the plant, Ledinek Engineering d.o.o. (Hoče-Maribor, Slovenia), the Kontizink finger-jointing line, a Stratoplan planing machine as well as t...

Read more

You can only use this article with a valid subscription and registration. Registered subscribers can access all articles after entering their user name and password.
- Ad -

Article topics
Article categories
- Ad -